That said, I'm close to done with bulkheads. I installed six and seven this weekend. They're quite floppy for now, being secured only by their corners.
It's got some serious volume now. Just one more bulkhead and I'll be set to put in cockpit seat fronts and stringers.
Speaking of seats - I installed the first of four slats for the rowing thwart. These are Jarrah, a native WA timber. It's one of the toughest timbers I know of. I'm told young Endeavour was built exclusively from Jarrah under the waterline. It's dense and incredibly tough. The plan is to use Jarrah for the thwart, the outer gunwale and rubbing strip, and for the bowsprit.
As planned, the centerboard case comes up level with the rowing thwart, so it's a comfortable seat. I sat on it today and sang "row row row your boat", much to Perry's bemusement.
The forward slat is structural - It braces the centerboard case. The jarrah runs right across to the sides of the boat. I pinned the slat to the centerboard case with dowels, so it should be plenty strong.
While I was working today, I had my new marine VHF radio on, listening to the comings and goings at the port. The radio is one of my tax return splurges - a cool little Icom one with inbuilt GPS and the ability to send an automated distress call at the press of a button.
No comments:
Post a Comment